
Tech Stack
Description
As Head of Research and Development at the Gadjah Mada Aerospace Team, I led engineering teams building rocket and satellite systems for international competitions.
I directed a 12-engineer team to redesign 4 hardware subsystems for a vertical landing rocket, cutting total project costs by 14% (IDR 2M saved) and reducing assembly and test cycle time by 25%.
I also led 9-member cross-functional teams (mechanical, electrical, software) to Top 5 finishes in both the Taiwan International Mission Idea Contest and the NASA CanSat Competition, out of 50+ international teams.
- Led a 12-engineer team to redesign 4 hardware subsystems for a vertical landing rocket.
- Cut total project costs by 14% (IDR 2M saved) and reduced assembly/test cycle time by 25%.
- Directed 9-member cross-functional teams to Top 5 finishes in Taiwan MIC and NASA CanSat.
- Presented root-cause analysis of 3 sensor noise failure events at IEEE ICARES 2025.
- Proposed a filter design that improved signal-to-noise ratio on flight-tested hardware.
Page Info
Vertical Landing Rocket
Redesigned 4 hardware subsystems, cutting project costs by 14% and reducing assembly/test cycle time by 25%.

NASA CanSat & Taiwan MIC
Delivered 2 fully functional prototypes within 12-week deadlines, achieving Top 5 finishes among 50+ international teams.
